5BY-5B Seed chemical treating machinery
Introduction 5BY-5B Seed chemical treating machinery
The5BY-5B Seed chemical treating machinery is very good for coating vegetable seed and grain seed, such as seeds of wheat, barley, maize, sorghum, soybeans, cotton, chili, grass, etc.
Principle of 5BY-5B Seed chemical treating machinery
Seeds can be continuous fed into mixing cylinder through feeding bucket elevator, at the same time quantitative medicine will be supplied by dosing pump, and then atomized by the high speed centrifugal rotary disk, following adhere to the surface of seeds, at the end compley mixed by the auger in the cylinder.
High speed centrifugal rotary disk (for atomizing the medicine) and large stainless steel cylinder (for mixing by auger rolling), can have a good coating effect.
Features of 5BY-5B Seed chemical treating machinery
-Centrifugal rotary disk for atomizing
-Overload and overheat protection
-Dosing pump for quantitative medicine supply
Technical Parameter of seed chemical treating machinery
Model |
Capacity(T/H) |
Power(KW) |
Weight(KG) |
Dimension L×W×H(mm) |
Agent Supply Model |
5BY-2 |
2 |
1.47 |
200 |
1600×800×1500 |
LDoon |
5BY-5A |
5 |
6 |
800 |
2200×900×2500 |
LDoon |
5BY-5B |
5 |
2.3 |
700 |
2150×800×2400 |
Dosing Pump |
Packaging & Shipping
Our ServicesWe have professional worldtrading team with rich worldtrading experience, provide full English user manual, Video using
instruction, Oversea machinery assembly and On-site training.
FAQ1. Q Are you factory or trading company?
A We are professional manufacturer for seed processing and also a international trading company
2. Q What is your minimum order quantity?
A 1 Set
3. Q What are your payment terms for new customers?
A T/T, L/C, Money Gram, West Union, Paypal etc
4. Q How long will it take for my products to arrive me?
A Usually by sea, 20 LDs to 50 LDs depend on which country you are in.
5. Q How can I visit your factory?
A1. From Guang Baiyun International Airport to LD international airport (2.5hours) , then to our factory by car (1hour)
A2. From Jinan West Railway Station to LD Railway Station by High-speedtrain(1.5 hours), then to our factory by car (45minutes)
A3. From Hongkong International airport to LD international airport (4.5hours), then to our factory by car (1hour)