Product Description
Product Application
Mini Size Instant make machinery/ Production Line/Plant1. Description: instant make machinery/production line/plant
a.We have semi automatic and full automatic two LLDe instant production line.
b.The machinery adopt wheat flour as main raw materials.
c.After buying our machinery,we will offer formular.
d.2-3 persons can operate the complete production line.
2. Raw materials: adopts wheat flour,water,salt,eggs etc as ingredients.We will offer specific formula after choosing
machinery.
3. Products: theshape and different grams can change by adjusting the cake box.
4. Capacity: 11000 bags 8 hours,30000 bags 8 hours,60000 bags 8 hours,80000 bags 8 hours etc.
5. Flow chart: Mixing system---Shaping system---- -Steaming system----Frying system----Cooling system----Pack system.
6. VoLDage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers’local voLDage according to different countries.
7. machinerys Materials: All the machinerys are made by stainless steel.
Main Features
1) Simple structure in linear LLDe ,easy in installation and maintation.
2) Adopting advanced worldfamous brand components in pneumatic parts ,electric parts and operation parts.
3) High pressure double crank to control the die opening and closing.
4) Running in a high automatization and inlectualization,no pollution
5) Apply a linker to connect with the air conveyor ,which can directly inline with filling machinery .
Main Features
Name: Bliwing Cylinder
Brand: FESTO
Original: Germany
Domestic famous engines, strong driving force, low fuel consumption, high economic benefits 12F+4R LDiding LDeeve shift.
machinery Parts
Name: Bliwing Cylinder
Brand: FESTO
Original: Germany
Domestic famous engines, strong driving force, low fuel consumption, high economic benefits 12F+4R LDiding LDeeve shift.
Main Features
Name: Bliwing Cylinder
Brand: FESTO
Original: Germany
Domestic famous engines, strong driving force, low fuel consumption, high economic benefits 12F+4R LDiding LDeeve shift.
b.) Project plng and desity services;
c.) Debugging of equipment until everything is functional;
d.) Management of equipments' long distance shipping from seller's factory to named place by buyer;
e.) Training of equipment maintenance and operating personally;
d.) New production techniques and formulas;
e.) Provide 1 year complete warranty and life-time maintenance service.
|
|