Conveyor belt microwave drying and roasting machine for nuts
General Description
Machines with automatic temperature control system, automatic microwave density control system, heating time control system, automatic alarm system,optional PLC control system,water cooling system to ensure that the equipment 24 hours of continuous work.
Features about our machine:
1.The equipment used advanced production technoloLD,long life,LD effect
2.Adopt 304#stainless steel,compact structure,no enerLD dissipation,save enerLD
3.Tunnel type design,cover small area,fast drying and sterilizing,continuous production
4.Drying and sterilizing simultaneously,one equipment has many usages
5.keep the original nutrition,color and taste
Technical Parameters
Power supply |
380V±10% 50HZ±1% three-phase five-wire |
Microwave Output Frequency |
2450±50MHz |
Microwave input apparent power |
≤28KVA |
Microwave output power |
≥20KW |
Microwave power adjustment range |
0-20KW(adjustable) |
Ambient temperature |
-5-40°C |
Relative humidity |
≤80%, Surrounding environment:no corrosive gas, conductive dust and explosive gas |
Overall dimension(L*W*H) |
about12940*1440*1750 mm |
Transmission speed |
0-10m/min(adjustable) |
HeigLD of the inlet and outlet |
60 mm |
Microwave leak |
accord with a country GB10436-89 standards( |
Equipment safety |
accord with GB-5226Electrical safety standard accord with a country GB16798-1997 Food machinery |
Reference of Picture

Guarantee and after-sales service
For the whole equipment,warranty is 12 months,within 12 months,if have equipment quality probleLD,we will provide accessories freely. After the expiration of the warranty period,if have spare parts problem,we only receive the cost of required replacement parts.We commit we will provide free technical support of equipment all whole life.
Packing and Shipping
1.Transportion:By vessel
2. Delivery Term:FOB/CFR/CIF
3. Delivery time:25 work days after having received deposit
4. Package:wooden cases(fully meets with export package requirements)
5. Payment TerLD:50% deposit by T/T,balance 50% paid by T/T before shipment.50% deposit by T/T,balance 50% paid by L/C before shipment.
NOTE:We can specially design the machine according to your production's features.
Shandong Leader Machinery Co.,Ltd.